This project was commissioned by TRLIA (Three Rivers Levee Improvement Authority). The job consisted of hauling and placing 250,000 cubic yards of material over an area of 2.1 miles. This is for a 100 year flood protection in the Yuba Gold Fields. Project started in December 2015 completed by February 2016.
Read MoreMonte Molina was the project manager/estimator for this project along with Kevin Carr. This project was located in the Suisun Bay, in Suisun, CA. The habitat that was created was 2.5 miles of habitat berm, 7800LF of channel excavation for tidal flow, 18,000LF of tidal ditches which flow into the main channel excavation, 4 large…
Read MoreThis project was for the Army Corps of Engineers, in Sacramento, CA. Four M Contracting, Inc was the prime contractor for this project. The scope of this project was to build a 3000′ LF 17′ tall floodwall. Four M handled all submittals, QC, safety and all project management. RNR Construction was our major subcontractor, constructing…
Read MoreThis was a mitigation project creating a new stream channel with two step pools, upland areas, a vegetative cut off wall and willow baffles; including transplanting over 22,000 willow pole cuttings.
Read More