Financial Resources
With each new project, Four M Contracting, Inc. provides documents assuring clients of our company’s assets and insurance. We provide bonding capacity and surety documents. We share the company’s current financial status reports, as well as an inventory of company-owned equipment. We have industry relationships and access to rent or lease any type of equipment required to execute the scope of our projects.
Bonding
Bonding Rates As of 04/21/15
Surety Company: Western Surety Company
- First $100,000 $14.40 per thousand
- Next $400,000 $14.40 per thousand
- Next $2,000,000 $8.70 per thousand
- Next $2,500,000 $6.90 per thousand
- Next $2,500,000 $6.30 per thousand
- Over $7,500,000 $5.76 per thousand
When the time for completion stated in the contract is beyond 12 months, the surety will add 1% of the original premium per month for each month of completion over 12 months (disregarding a fraction of a month).
Maintenance Rate Surcharge: (beyond 1-year Warranty period, charge per year based on contract price)
- First $100,000 $2.16 per thousand
- Next $400,000 $2.16 per thousand
- Next $2,000,000 $1.80 per thousand
- Next $2,500,000 $1.50 per thousand
- Next $2.5,000,000 $1.32 per thousand
- Over $7,500,000 $1.20 per thousand
Premium based on final contract price.
# | Project | CONTRACT AMOUNT |
---|---|---|
1 | WESTERN AGGREGATES – HAUL MATERIAL | $ 808,606 |
2 | CEMEX – CACHE CREEK DRY MINE | $ 106,483 |
3 | CWA – WISTER UNITS T10 & S22-20 | $ 413,685 |
4 | FORGEN – BEL MARIN KEYS | $ 268,504 |
5 | MARIANI NUT COMPANY | $ 987,318 |
6 | WESTLANDS WD – LOWER YOLO RESTORATION | $ 8,467,055 |
7 | NORTHERN RECYCLING LEVELING | $ 11,275 |
8 | MBK – YOLO BYPASS LEVEE REPAIR | $ 386,130 |
TOTALS | $ 11,449,056 |
# | PROJECT | CONTRACT AMOUNT |
---|---|---|
1 | WESTERN AGGREGATES – HAUL MATERIAL | $ 626,314.00 |
2 | GRANITE – SOLAR FIELDS | $ 288,548.00 |
3 | GRANITE – MANAGED MARSH | $ 193,917.00 |
4 | CWA – WISTER UNITS T-10 & S-20 | $ 57,350.00 |
5 | NRCS – RUSH CREEK BDAs & REPAIRS | $ 125,382.00 |
6 | NRCS – SMOKE CREEK REPAIRS | $ 453,343.00 |
7 | CEMEX – CACHE CREEK STRIPPING | $ 1,249,943.00 |
8 | MORRO BAY ESTUARY – CHORRO CREEK | $ 832,758.00 |
9 | BLM – POND 3A | $ 57,500.00 |
10 | MALLARD DUCK CLUB | $ 411,502.00 |
11 | USACE – YOLO LEVEE REPAIRS | $ 738,143.00 |
12 | DUTRA – TULE RED PHASE 2 MOWING | $ 30,927.00 |
13 | NORTHERN RECYCLING GRADING | $ 36,576.00 |
TOTALS | $ 5,102,203 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
San Diego County Water Authority – Wister Fishery Project | SDCWA | $2,798,000 | $2,506,586 | Kevin Carr & Monte Molina | 10/2014 |
MBK Engineers – Holland Tract Levee Rehab Project; Reclamation District No. 2025 | Reclamation Dist 2025 | $2,184,600 | $2,281,510 | Kevin Carr & Monte Molina | 8/2014 |
Hostetler Ranches – Bellevue Ditch Grading | Hostetler Ranches | $4,750 | $4,750 | Monte Molina | 1/31/14 |
South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad – Contract 2A | U.S. Army Corp. of Engineers | $5,009,710.00 | $9,386,121 | Monte Molina & Kevin Carr | 2/2014 |
River Partners – Dutch Slough/Gilbert Parcel Tule Nursery | MBK Engineers | $65,835 | $65,835 | Monte Molina | 1/17/14 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Hostetler Ranches – Winters Orchard | Hostetler Ranches | $49,061 | $49,061 | Monte Molina | 12/31/13 |
MBK Engineers – Trailer Removal | MBK Engineers | $60,978 | $60,978 | Monte Molina | 12/13/13 |
CWA – Putah Creek | CWA | $180,498 | $180,498 | Monte Molina | 11/13/13 |
CWA – Viducich | CWA | $129,116 | $129,116 | Monte Molina | 10/4/13 |
CWA – Wister WA 514 | CWA | $139,225 | $139,225 | Monte Molina | 6/17/13 |
CWA – Hazard Unit East | CWA | $11,415 | $11,415 | Monte Molina | 5/22/13 |
CWA – Wister 515B | CWA | $35,500 | $35,500 | Monte Molina | 6/17/13 |
CWA – Wister Y16D Duck Stamp | CWA | $49,600 | $49,600 | Monte Molina | 6/17/13 |
CWA – WRP Phister Job 135 | CWA | $129,116 | $129,116 | Monte Molina | 8/9/13 |
CWA – WA 114 | CWA | $5,550 | $5,550 | Monte Molina | 7/11/13 |
KO Underground Construction North Bay WWTP | KO Underground Construction | $124,812 | Monte Molina | 6/17/13 | |
Ducks Unlimited Sunrise Marsh Prject | DU | $139,90 | $220,700 | Monte Molina | 9/9/13 |
CWA – WA312C | CWA | $95,075 | $115,805 | Monte Molina | 6/17/13 |
CWA – Hazard Unit | CWA | $48,282 | $48,282 | Monte Molina | 5/22/13 |
CWA – Wister W11B W11D | CWA | $202,436 | $202,436 | Monte Molina | 5/22/13 |
CWA Mecca Land Company Restoration Project | CWA | $18,472 | $18,472 | Monte Molina | 4/22/13 |
Hostetler Ranches – SloanRanch | Hostetler Ranches | $48,158 | $48,158 | Monte Molina | 4/15/13 |
Whitesbridge Farms, LLC Fresno Project | Whitesbridge Farms, LLC | $98,678 | $98,678 | Monte Molina | 4/15/13 |
Hostetler Ranches – Pond In Winters | Hostetler Ranches | $6,670 | $6,670 | Monte Molina | 3/2013 |
NAVFAC Southwest Lemoore Fead/Code ROPWL Naval Air Station Lemoore | NAVFAC Southwest | $313,000 | $313,000 | Kevin Carr | 3/2013 |
Hostetler Ranches – Merced Land Leveling | Hostetler Ranches | $192,215 | $192,215 | Monte Molina | 3/2013 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Pit River RCD Ash Creek Wildlife Restoration Project | Pit River RCD | $870,730 | $870,730 | Monte Molina | 11/2012 |
Olam Tomato Processing Plant – Grading Work | Olam Tomato | $6,500 | $6,500 | Monte Molina | 6/18/12 |
Olam Tomato Processing Plant Leveling Project Hahn Road @ OHM road | Olam Tomato | $45,900 | $45,900 | Monte Molina | 6/11/12 |
Reclamation Dist. 2025, Holland Tract Levee Rehab Project, Spec#2025-09-11-1 | MBK Engineers | $509,710.00 | $731,201.98 | Monte Molina | 5/2012 |
Mariani Nut Almond Plant Leveling | Mariani Nut Company | T&M | $4009.00 | Monte Molina | 4/19/12 |
South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad – Contract 2A | U.S. Army Corp. of Engineers | 5,009,710.00 | Monte Molina & Kevin Carr | Still in progress |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Reclamation Dist. 2025, Holland Tract Levee Rehab Project, Spec#2025-09-11-1 | MBK Engineers | $509,710.00 | 731,201.98 | Monte Molina | Still in Progress |
ARROYO DE LA LAGUNA WILLOW RIPARIAN SCRUB AND RIPARIAN HABITAT RESTORATION PROJECT | Alameda County Resource Conservation Dist | $453,044.00 | $495,111.00 | Monte Molina | 10/12/11 |
ARROYO DE LA LAGUNA STREAM RESTORATION PROJECT AT VERONA BRIDGE | Alameda County Resource Conservation Dist | $519,459.00 | $687,662.80 | Monte Molina | 10/15/11 |
COSUMNES FLOODPLAIN MITIGATION BANK – PHASE II | Westervelt Ecological Services, Inc | $69,231.00 | $69,231.00 | Monte Molina | 8/25/11 |
Grading @ Basalite | Basalite Concrete Products | $3,000.00 | $3,000.00 | Monte Molina | 7/25/11 |
Robin’s Roost | California Waterfowl Assoc. | $48,800.00 | $48,800.00 | Monte Molina | 7/25/11 |
Imperial Valley WBC Enhancement | California Waterfowl Assoc. | $13,200.00 | $13,200.00 | Monte Molina | 6/24/11 |
Y14 DS Project | California Waterfowl Assoc. | $44,500.00 | $44,500.00 | Monte Molina | 6/24/11 |
Wister U12 – Duck Stamp | California Waterfowl Assoc. | $4,050.00 | 4050.00 | Monte Molina | 6/24/11 |
Imperial WCB Project | California Waterfowl Assoc. | Monte Molina | 06/15/11 | ||
Land Leveling Co. Rd. 91A | John Frazier | $10,140.00 | $10,140.00 | Monte Molina | 06/03/11 |
Salton Sea Sonoran Wetland NAWCA | Ducks Unlimited | $13,492.00 | $13,492.00 | Monte Molina | 05/23/11 |
Five Brooks Stables | National Park Service, Point Reyes | $40,052.00 | $43,136.00 | Monte Molina | 05/12/11 |
San Luis Wildlife Refuge | U.S. Fish & Wildlife | $88,800.00 | $88,800.00 | Monte Molina | 05/11/11 |
Westside Transplant Building Pads | Westside Transplant | $82,500.00 | $82,500.00 | Monte Molina | 05/06/11 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
San Luis Wildlife Refuge | U.S. Fish & Wildlife | $150,600.00 | $150,600.00 | Monte Molina | 12/28/10 |
SCWA – Putah Creek Dirt Placement | Solano County Water Agency | $6,980.00 | $6,980.00 | Monte Molina | 11/29/10 |
Powers Perch Pond | Yolo County RCD | $17,000.00 | $17,000.00 | Monte Molina | 10/22/10 |
Liberty Island | CG Construction | $33,785.00 | $33,785.00 | Monte Molina | 09/29/10 |
Cosumnes Floodplain Mitigation Bank (Phase 1) | Westervelt Ecological Service | $627,834.00 | $639,850.00 | Monte Molina | 09/17/10 |
Olam AB Pad | Olam Tomato Process Plant | $23,621.00 | $23,621.00 | Monte Molina | 09/14/10 |
Sonoran/Imperial | Ducks Unlimited | $240,418.00 | $285,978.16 | Monte Molina | 08/31/10 |
Vendel Duck Club | Myron Thorton | $30,000.00 | $30,000.00 | Monte Molina | 08/29/10 |
Hahn/Meyers Rd – Olam Plant | Olam Tomato Plant | $32,440.00 | $32,440.00 | Monte Molina | 07/8/10 |
Upper Butte Basin Additional Work | Ducks Unlimited | $25,595.00 | $25,595.00 | Monte Molina | 06/24/10 |
Corral Ponds | Ducks Unlimited | $19,653.00 | $27,233.00 | Monte Molina | 06/16/10 |
Dunnigan Land Leveling | CG Construction | $30,165.00 | $30,165.00 | Monte Molina | 06/16/10 |
Traffican Home Site | Pat Traffican | $39,114.00 | $39,114.00 | Monte Molina | 05/27/10 |
Diablo Valley College Bus Drive-Thru | Maxicrete | $52,447.50 | $52447.50 | Monte Molina | 04/19/10 |
Auburn Solar Pad | Independent Construction | $9,000.00 | $9,000.00 | Monte Molina | 03/30/10 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Morning Star Farms / Field Clean-up | CG Construction | $9,830.00 | $9,830.00 | Monte Molina | 12/04/09 |
Dingville Duck Club | Ducks Unlimited | $149,884.60 | $217,791.00 | Monte Molina | 11/20/09 |
Equipment Rental | CG Construction | $10,781.00 | $10,781.00 | Monte Molina | 11/12/09 |
Putah Creek Perc Dam Removal | KO Construction | $62,294.11 | $62,294.11 | Monte Molina | 11/03/09 |
Upper Butte Basin / Field 205 | Ducks Unlimited | $35,257.00 | $35,257.00 | Monte Molina | 10/07/09 |
Owner/Operator job | CG Construction | $17,550.00 | $17,550.00 | Monte Molina | 09/29/09 |
San Pablo Bay | Ducks Unlimited | $254,521.40 | $272,660.40 | Monte Molina | 09/23/09 |
Oakley Project | CG Construction | $18,070.00 | $18,070.00 | Monte Molina | 09/22/09 |
Gray Lodge – Field 93 Swale Re-grade | Ducks Unlimited | $6,624.00 | $6,624.00 | Monte Molina | 07/09/09 |
Gray Lodge | Ducks Unlimited | $18,343.44 | $18,343.44 | Monte Molina | 07/09/09 |
Wildlands Rental | CG Construction | $36,334.09 | $36,334.09 | Monte Molina | 07/05/09 |
Wister Wildlife Area – Dozer work | California Waterfowl Assoc. | $3080.00 | $3080.00 | Monte Molina | 06/17/09 |
Salton Sea Conservatory | California Waterfowl Assoc. | $56,650.00 | $56,650.00 | Monte Molina | 06/17/09 |
Million Dollar Duck Club | California Waterfowl Assoc. | $34,460.00 | $34,460.00 | Monte Molina | 06/16/09 |
Wister Wildlife Area | Ducks Unlimited | $140,890.00 | $140,890.00 | Monte Molina | 06/03/09 |
Pond Construction & Channel Improvements | Ducks Unlimited | $47,840.00 | $47,840.00 | Monte Molina | 06/03/09 |
Dozer Work T14, U14, W11C & Y16 | California Waterfowl Assoc. | $14,000.00 | $14,000.00 | Monte Molina | 06/01/09 |
W11C Unit & Ditch work | California Waterfowl Assoc. | $68,950.00 | $68,950.00 | Monte Molina | 06/01/09 |
Fields Y16 A&B | California Waterfowl Assoc. | $149,440.00 | $149,440.00 | Monte Molina | 05/27/09 |
Duck Stamp WCS Install | California Waterfowl Assoc. | $6,710.00 | $6,710.00 | Monte Molina | 05/04/09 |
Ridgeway #1 | California Waterfowl Assoc. | $64,000.00 | $64,000.00 | Monte Molina | 04/15/09 |
Ridgeway #2 | California Waterfowl Assoc. | $27,450.00 | $27,450.00 | Monte Molina | 04/15/09 |
Y16 A&B Dozer Work | California Waterfowl Assoc. | $5,600.00 | $5,600.00 | Monte Molina | 04/15/09 |
Y16 A&B Tree/Shrub Removal | California Waterfowl Assoc. | $11,480.00 | $11,480.00 | Monte Molina | 04/02/09 |
Palo Verde | California Waterfowl Assoc. | $13,450.00 | $13,450.00 | Monte Molina | 03/20/09 |
Wister Duck Stamp Leveling | California Waterfowl Assoc. | $33,000.00 | $33,000.00 | Monte Molina | 03/20/09 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Grading @ Elkhorn Blvd. | Michaels Corp. | $4,936.37 | $4,936.37 | Monte Molina | 12/22/08 |
Tailwater Wildlife Pond | Pacific Star Gardens | $17,295.00 | $17,295.00 | Monte Molina | 12/03/08 |
Sutter Basin Conservation Bank | Westervelt Ecological Services LLC | $1,161,708.00 | $1,142,890.00 | Monte Molina | 11/24/08 |
BobCat Ranch Pond Work | Audubon of California | $3,250.00 | $3,250.00 | Monte Molina | 11/11/08 |
Yolo Bypass – Boardwalk | Ducks Unlimited/CA Dept Fish & Game | $40,980.00 | $40,980.00 | Monte Molina | 10/20/08 |
Llano Seco Ranch | Ducks Unlimited | $$147,883.65 | $156,003.65 | Monte Molina | 09/29/08 |
Yolo-Delta Tule Ranch | Ducks Unlimited | $123,054.00 | $125,554.00 | Monte Molina | 09/15/08 |
Sprandio Perch Pond | Yolo Co. RCD | $3,000.00 | $3,000.00 | Monte Molina | 09/11/08 |
Imperial/Wister Wetland | Ducks Unlimited | $315,972.00 | $344,972.00 | Monte Molina | 08/28/08 |
Wister T14 | California Waterfowl Assoc. | $92,400.00 | $92,400.00 | Monte Molina | 08/21/08 |
Rock Placement @ BobCat Ranch | Audubon of California | $17,000.00 | $17,000.00 | Monte Molina | 08/15/08 |
Wister T14 Discing | California Waterfowl Assoc. | $5,440.00 | $5,440.00 | Monte Molina | 08/08/08 |
Sonoran Wetland – Sonny Bono | Ducks Unlimited | $13,500.00 | $16,000.00 | Monte Molina | 08/07/08 |
Palo Verde Ecological Reserve | Ducks Unlimited | $6,400.00 | $6,400.00 | Monte Molina | 08/04/08 |
Wister Unit U14 | California Waterfowl Assoc. | $57,500.00 | $57,500.00 | Monte Molina | 07/30/08 |
Cazador Duck Club | Ducks Unlimited | $62,352.00 | $62,352.00 | Monte Molina | 07/26/08 |
Flyway Ditch | Ducks Unlimited | $26,720.00 | $28,220.00 | Monte Molina | 06/30/08 |
Tulare NAWCA – Goose Lake | Ducks Unlimited | $396,712.00 | $388,152.15 | Monte Molina | 02/27/08 |
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Gray Lodge Wildlife Area | Ducks Unlimited | $325,370.00 | $325,370.00 | Monte Molina | 12/20/07 |
Gray Lodge Water Distribution System | Ducks Unlimited – Brian Heidman | $498,271.00 | $513,135.50 | Monte Molina | 009/23/07 |