Project Database

Project Name

Project Owner

Original Contracted Amount

Final Contract Amount

Project Manager

Date Completed

YEAR 2014

San Diego County Water Authority – Wister Fishery Project

SDCWA

$2,798,000

$2,506,586

Kevin Carr & Monte Molina

10/2014

MBK Engineers –

Holland Tract Levee Rehab Project;

Reclamation District No. 2025

Reclamation Dist 2025

$2,184,600

$2,281,510

Kevin Carr & Monte Molina

8/2014

Hostetler Ranches –

Bellevue Ditch Grading

Hostetler Ranches

$4,750

$4,750

Monte Molina

1/31/14

South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad - Contract 2A

U.S. Army Corp. of Engineers

$5,009,710.00

$9,386,121

Monte Molina & Kevin Carr

2/2014

River Partners –

Dutch Slough/Gilbert Parcel Tule Nursery

MBK Engineers

$65,835

$65,835

Monte Molina

1/17/14

YEAR 2013

Hostetler Ranches –

Winters Orchard

Hostetler Ranches

$49,061

$49,061

Monte Molina

12/31/13

MBK Engineers –

Trailer Removal

MBK Engineers

$60,978

$60,978

Monte Molina

12/13/13

CWA – Putah Creek

CWA

$180,498

$180,498

Monte Molina

11/13/13

CWA – Viducich

CWA

$129,116

$129,116

Monte Molina

10/4/13

CWA – Wister WA 514

CWA

$139,225

$139,225

Monte Molina

6/17/13

CWA – Hazard Unit East

CWA

$11,415

$11,415

Monte Molina

5/22/13

CWA – Wister 515B

CWA

$35,500

$35,500

Monte Molina

6/17/13

CWA – Wister

Y16D Duck Stamp

CWA

$49,600

$49,600

Monte Molina

6/17/13

CWA – WRP Phister Job 135

CWA

$129,116

$129,116

Monte Molina

8/9/13

CWA – WA 114

CWA

$5,550

$5,550

Monte Molina

7/11/13

KO Underground Construction

North Bay WWTP

KO Underground Construction

$124,812

Monte Molina

6/17/13

Ducks Unlimited

Sunrise Marsh Prject

DU

$139,90

$220,700

Monte Molina

9/9/13

CWA – WA312C

CWA

$95,075

$115,805

Monte Molina

6/17/13

CWA – Hazard Unit

CWA

$48,282

$48,282

Monte Molina

5/22/13

CWA – Wister W11B W11D

CWA

$202,436

$202,436

Monte Molina

5/22/13

CWA

Mecca Land Company Restoration Project

CWA

$18,472

$18,472

Monte Molina

4/22/13

Hostetler Ranches - SloanRanch

Hostetler Ranches

$48,158

$48,158

Monte Molina

4/15/13

Whitesbridge Farms, LLC

Fresno Project

Whitesbridge Farms, LLC

$98,678

$98,678

Monte Molina

4/15/13

Hostetler Ranches –

Pond In Winters

Hostetler Ranches

$6,670

$6,670

Monte Molina

3/2013

NAVFAC Southwest

Lemoore Fead/Code ROPWL

Naval Air Station Lemoore

NAVFAC Southwest

$313,000

$313,000

Kevin Carr

3/2013

Hostetler Ranches – Merced Land Leveling

Hostetler Ranches

$192,215

$192,215

Monte Molina

3/2013

YEAR 2012

Monte Molina

Pit River RCD

Ash Creek Wildlife Restoration Project

Pit River RCD

$870,730

$870,730

Monte Molina

11/2012

Olam Tomato Processing Plant – Grading Work

Olam Tomato

$6,500

$6,500

Monte Molina

6/18/12

Olam Tomato Processing Plant Leveling Project

Hahn Road @ OHM road

Olam Tomato

$45,900

$45,900

Monte Molina

6/11/12

Reclamation Dist. 2025, Holland Tract Levee Rehab Project, Spec#2025-09-11-1

MBK Engineers

$509,710.00

$731,201.98

Monte Molina

5/2012

Mariani Nut

Almond Plant Leveling

Mariani Nut Company

T&M

$4009.00

Monte Molina

4/19/12

South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad - Contract 2A

U.S. Army Corp. of Engineers

5,009,710.00

Monte Molina & Kevin Carr

Still in progress

YEAR 2011

Reclamation Dist. 2025, Holland Tract Levee Rehab Project, Spec#2025-09-11-1

MBK Engineers

$509,710.00

731,201.98

Monte Molina

Still in Progress

ARROYO DE LA LAGUNA WILLOW RIPARIAN SCRUB AND RIPARIAN HABITAT RESTORATION PROJECT

Alameda County Resource Conservation Dist

$453,044.00

$495,111.00

Monte Molina

10/12/11

ARROYO DE LA LAGUNA STREAM RESTORATION PROJECT AT VERONA BRIDGE

Alameda County Resource Conservation Dist

$519,459.00

$687,662.80

Monte Molina

10/15/11

COSUMNES FLOODPLAIN MITIGATION BANK - PHASE II

Westervelt Ecological Services, Inc

$69,231.00

$69,231.00

Monte Molina

8/25/11

Grading @ Basalite

Basalite Concrete Products

$3,000.00

$3,000.00

Monte Molina

7/25/11

Robin’s Roost

California Waterfowl Assoc.

$48,800.00

$48,800.00

Monte Molina

7/25/11

Imperial Valley

WBC Enhancement

California Waterfowl Assoc.

$13,200.00

$13,200.00

Monte Molina

6/24/11

Y14 DS Project

California Waterfowl Assoc.

$44,500.00

$44,500.00

Monte Molina

6/24/11

Wister U12 – Duck Stamp

California Waterfowl Assoc.

$4,050.00

4050.00

Monte Molina

6/24/11

Imperial WCB Project

California Waterfowl Assoc.

Monte Molina

06/15/11

Land Leveling Co. Rd. 91A

John Frazier

$10,140.00

$10,140.00

Monte Molina

06/03/11

Salton Sea Sonoran

Wetland NAWCA

Ducks Unlimited

$13,492.00

$13,492.00

Monte Molina

05/23/11

Five Brooks Stables

National Park Service, Point Reyes

$40,052.00

$43,136.00

Monte Molina

05/12/11

San Luis Wildlife Refuge

U.S. Fish & Wildlife

$88,800.00

$88,800.00

Monte Molina

05/11/11

Westside Transplant Building Pads

Westside Transplant

$82,500.00

$82,500.00

Monte Molina

05/06/11

Monte Molina

YEAR 2010

Monte Molina

San Luis Wildlife Refuge

U.S. Fish & Wildlife

$150,600.00

$150,600.00

Monte Molina

12/28/10

SCWA – Putah Creek Dirt Placement

Solano County Water Agency

$6,980.00

$6,980.00

Monte Molina

11/29/10

Powers Perch Pond

Yolo County RCD

$17,000.00

$17,000.00

Monte Molina

10/22/10

Liberty Island

CG Construction

$33,785.00

$33,785.00

Monte Molina

09/29/10

Cosumnes Floodplain Mitigation Bank (Phase 1)

Westervelt Ecological Service

$627,834.00

$639,850.00

Monte Molina

09/17/10

Olam AB Pad

Olam Tomato Process Plant

$23,621.00

$23,621.00

Monte Molina

09/14/10

Sonoran/Imperial

Ducks Unlimited

$240,418.00

$285,978.16

Monte Molina

08/31/10

Vendel Duck Club

Myron Thorton

$30,000.00

$30,000.00

Monte Molina

08/29/10

Hahn/Meyers Rd – Olam Plant

Olam Tomato Plant

$32,440.00

$32,440.00

Monte Molina

07/8/10

Upper Butte Basin

Additional Work

Ducks Unlimited

$25,595.00

$25,595.00

Monte Molina

06/24/10

Corral Ponds

Ducks Unlimited

$19,653.00

$27,233.00

Monte Molina

06/16/10

Dunnigan Land Leveling

CG Construction

$30,165.00

$30,165.00

Monte Molina

06/16/10

Traffican Home Site

Pat Traffican

$39,114.00

$39,114.00

Monte Molina

05/27/10

Diablo Valley College Bus Drive-Thru

Maxicrete

$52,447.50

$52447.50

Monte Molina

04/19/10

Auburn Solar Pad

Independent Construction

$9,000.00

$9,000.00

Monte Molina

03/30/10

YEAR 2009

Monte Molina

Morning Star Farms / Field Clean-up

CG Construction

$9,830.00

$9,830.00

Monte Molina

12/04/09

Dingville Duck Club

Ducks Unlimited

$149,884.60

$217,791.00

Monte Molina

11/20/09

Equipment Rental

CG Construction

$10,781.00

$10,781.00

Monte Molina

11/12/09

Putah Creek Perc Dam Removal

KO Construction

$62,294.11

$62,294.11

Monte Molina

11/03/09

Upper Butte Basin / Field 205

Ducks Unlimited

$35,257.00

$35,257.00

Monte Molina

10/07/09

Owner/Operator job

CG Construction

$17,550.00

$17,550.00

Monte Molina

09/29/09

San Pablo Bay

Ducks Unlimited

$254,521.40

$272,660.40

Monte Molina

09/23/09

Oakley Project

CG Construction

$18,070.00

$18,070.00

Monte Molina

09/22/09

Gray Lodge – Field 93

Swale Re-grade

Ducks Unlimited

$6,624.00

$6,624.00

Monte Molina

07/09/09

Gray Lodge

Ducks Unlimited

$18,343.44

$18,343.44

Monte Molina

07/09/09

Wildlands Rental

CG Construction

$36,334.09

$36,334.09

Monte Molina

07/05/09

Wister Wildlife Area – Dozer work

California Waterfowl Assoc.

$3080.00

$3080.00

Monte Molina

06/17/09

Salton Sea Conservatory

California Waterfowl Assoc.

$56,650.00

$56,650.00

Monte Molina

06/17/09

Million Dollar Duck Club

California Waterfowl Assoc.

$34,460.00

$34,460.00

Monte Molina

06/16/09

Wister Wildlife Area

Ducks Unlimited

$140,890.00

$140,890.00

Monte Molina

06/03/09

Pond Construction & Channel Improvements

Ducks Unlimited

$47,840.00

$47,840.00

Monte Molina

06/03/09

Dozer Work T14, U14, W11C & Y16

California Waterfowl Assoc.

$14,000.00

$14,000.00

Monte Molina

06/01/09

W11C Unit & Ditch work

California Waterfowl Assoc.

$68,950.00

$68,950.00

Monte Molina

06/01/09

Fields Y16 A&B

California Waterfowl Assoc.

$149,440.00

$149,440.00

Monte Molina

05/27/09

Duck Stamp WCS Install

California Waterfowl Assoc.

$6,710.00

$6,710.00

Monte Molina

05/04/09

Ridgeway #1

California Waterfowl Assoc.

$64,000.00

$64,000.00

Monte Molina

04/15/09

Ridgeway #2

California Waterfowl Assoc.

$27,450.00

$27,450.00

Monte Molina

04/15/09

Y16 A&B Dozer Work

California Waterfowl Assoc.

$5,600.00

$5,600.00

Monte Molina

04/15/09

Y16 A&B Tree/Shrub Removal

California Waterfowl Assoc.

$11,480.00

$11,480.00

Monte Molina

04/02/09

Palo Verde

California Waterfowl Assoc.

$13,450.00

$13,450.00

Monte Molina

03/20/09

Wister Duck Stamp Leveling

California Waterfowl Assoc.

$33,000.00

$33,000.00

Monte Molina

03/20/09

YEAR 2008

Monte Molina

Grading @ Elkhorn Blvd.

Michaels Corp.

$4,936.37

$4,936.37

Monte Molina

12/22/08

Tailwater Wildlife Pond

Pacific Star Gardens

$17,295.00

$17,295.00

Monte Molina

12/03/08

Sutter Basin Conservation Bank

Westervelt Ecological Services LLC

$1,161,708.00

$1,142,890.00

Monte Molina

11/24/08

BobCat Ranch Pond Work

Audubon of California

$3,250.00

$3,250.00

Monte Molina

11/11/08

Yolo Bypass – Boardwalk

Ducks Unlimited/CA Dept Fish & Game

$40,980.00

$40,980.00

Monte Molina

10/20/08

Llano Seco Ranch

Ducks Unlimited

$$147,883.65

$156,003.65

Monte Molina

09/29/08

Yolo-Delta Tule Ranch

Ducks Unlimited

$123,054.00

$125,554.00

Monte Molina

09/15/08

Sprandio Perch Pond

Yolo Co. RCD

$3,000.00

$3,000.00

Monte Molina

09/11/08

Imperial/Wister Wetland

Ducks Unlimited

$315,972.00

$344,972.00

Monte Molina

08/28/08

Wister T14

California Waterfowl Assoc.

$92,400.00

$92,400.00

Monte Molina

08/21/08

Rock Placement @ BobCat Ranch

Audubon of California

$17,000.00

$17,000.00

Monte Molina

08/15/08

Wister T14 Discing

California Waterfowl Assoc.

$5,440.00

$5,440.00

Monte Molina

08/08/08

Sonoran Wetland – Sonny Bono

Ducks Unlimited

$13,500.00

$16,000.00

Monte Molina

08/07/08

Palo Verde Ecological Reserve

Ducks Unlimited

$6,400.00

$6,400.00

Monte Molina

08/04/08

Wister Unit U14

California Waterfowl Assoc.

$57,500.00

$57,500.00

Monte Molina

07/30/08

Cazador Duck Club

Ducks Unlimited

$62,352.00

$62,352.00

Monte Molina

07/26/08

Flyway Ditch

Ducks Unlimited

$26,720.00

$28,220.00

Monte Molina

06/30/08

Tulare NAWCA – Goose Lake

Ducks Unlimited

$396,712.00

$388,152.15

Monte Molina

02/27/08

YEAR 2007

Monte Molina

Gray Lodge Wildlife Area

Ducks Unlimited

$325,370.00

$325,370.00

Monte Molina

12/20/07

Gray Lodge Water Distribution System Ducks Unlimited - Brian Heidman $498,271.00 $513,135.50 Monte Molina 009/23/07

Tule Red 2018

October 31, 2018. Quick description. 

Four M Contracting, Inc. hauled and placed over 350,000 cubic yards of saturated soils that had to be dried prior to placement, and compaction requirements. FMC had to manage all soil per the permit conditions of the project. Selective mowing,  Water management, tides clearing, had to be managed throughout the project. 7,300' of new channel was constructed, along with 4 ponds, and many side channels. The breech of 500' remaining will occur sometime in 2019.

Before & After

Prior to Construction _1  Tule Red_1

  • Tule Red 2018_1
  • Hits: 7
  • Tule Red 2018_2
  • Hits: 6
  • Tule Red 2018_3
  • Hits: 5
  • Tule Red_1
  • Hits: 5

2017 project Open Space Restoration UCSB Santa Barbara

  • 2017 project Open Space Restoration UCSB Santa Barbara_1
  • Hits: 5
  • 2017 project Open Space Restoration UCSB Santa Barbara_2
  • Hits: 5
  • 2017 project Open Space Restoration UCSB Santa Barbara_3
  • Hits: 5
  • 2017 project Open Space Restoration UCSB Santa Barbara_4
  • Hits: 5

Yuba Goldfields, TRLIA

Yuba Goldfields, TRLIA_1 Yuba Goldfields, TRLIA_2 Yuba Goldfields, TRLIA_3

 

This project was commissioned by TRLIA (Three Rivers Levee Improvement Authority).  The job consisted of hauling and placing 250,000 cubic yards of material over an area of 2.1 miles. This is for a 100 year flood protection in the Yuba Gold Fields.  Project started in December 2015 completed by February 2016.

Oak Valley Mitigation Project

Crest Boulder_1 Pic of uper step pool_1 Step pool close_1 Step pool wide_1 Veg cut off wall_1

This was a mitigation project creating a new stream channel with two step pools, upland areas, a vegetative cut off wall and willow baffles; including transplanting over 22,000 willow pole cuttings.