Four M Contracting, Inc.
Total number of hits on all images: 64,056
- Putah Creek 2018
- (7 images)
- Hits: 30
- Tule Red 2018
- (8 images)
- Hits: 47
- 2017 project Open Space Restoration UCSB Santa Barbara
- (5 images)
- Hits: 25
- Yuba Goldfields, TRLIA
- (3 images)
- Hits: 1,824
-
This project was commissioned by TRLIA (Three Rivers Levee Improvement Authority). The job consisted of hauling and placing 250,000 cubic yards of material over an area of 2.1 miles. This is for a 100 year flood protection in the Yuba Gold Fields. Project started in December 2015 completed by February 2016.
- Oak Valley Mitigation Project
- (33 images)
- Hits: 12,681
-
This was a mitigation project creating a new stream channel with two step pools, upland areas, a vegetative cut off wall and willow baffles; including transplanting over 22,000 willow pole cuttings.
- Grasslands Mitigation Bank
- (5 images)
- Hits: 1,863
-
This project was completed by hauling and placing over 250,000 cubic yards to creating seasonal wetlands and upland habitat. We built a 1 mile long re-circulation ditch and installed over 23 structures with associated rip rap. We also hauled and placed ¾ AB and seeded the site as well. Both the Colusa and Grassland projects were mitigation projects for the Giant Gardner Snake.
- Colusa Basin
- (1 image)
- Hits: 603
-
FMC moved 100,000 cubic yards to create wetland and upland areas at Colusa Basin. We also installed 7 water control structures and several water conveyance channels.
- Wister Sports fishery spec 600
- (10 images)
- Hits: 7,091

Affiliations
- Small Business Certified by the California Department of General Services
- Signatory with Operating Engineers Local #3
- Member of NAEC (Northern Alliance of Engineering Confrence)