Tule Red 2018

Tule Red 2018

Tule Red 2018 Tule Red 2018

Four M Contracting, Inc. hauled and placed over 350,000 cubic yards of saturated soils that had to be dried prior to placement, and compaction requirements. FMC had to manage all soil per the permit conditions of the project. Selective mowing,  Water management, tides clearing, had to be managed throughout the project. 7,300' of new channel was constructed, along with 4 ponds, and many side channels. The breech of 500' remaining will occur sometime in 2019.