2012-2014 PROJECTS | AMOUNT | DESCRIPTION |
USACE CONTRACT 2A MORRISON @ UPRR S. SAC. | $ 9,342,122 | Built 3,000 LF of 17' floodwall with earthen berm between property line and floodwall. |
NAS LEMOORE SECURITY ENCLAVE | $ 313,000 | 8a fencing and paving project for the department of the Navy. |
MBK GILBERT PARCEL TULE NURSERY | $ 65,835 | Built small berm to create ponds for a tule nursery to supply habitat projects. |
MBK RD 2025 HOLLAND TRACT LEVEE REHAB P2 | $ 2,281,510 | Built 2.5 miles of levee toe berm and added soil for levee side to make 3:1 slope - hauled and placed 150,000 CY of material. |
SDCWA WISTER SPORT FISHERY | $ 2,506,586 | Worked for San Diego County Water Authority adding material to 4 large levees and removing two small levees to create one large pond - hauled and placed 250,000 CY of material. |
CWA WISTER UNITS 114A & 413 | $ 523,459 | Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl. |
GRANITE IID MANAGED MARSH | $ 449,394 | Created earthen habitat berms - hauled and placed 50,000 CY of material. Levees were 3' tall and 12' wide to hold back water for habitat restoration. |
2015 PROJECTS | AMOUNT | DESCRIPTION |
HOSTETLER FARMS | $ 76,221 | General land leveling for local farmer. |
NRCS DRY CREEK | $ 75,133 | Created habitat building ponds and earthen berm for wildlife. |
WESTERVELT COLUSA BASIN | $ 372,491 | Created habitat building ponds and earthen berm for Giant Garter Snake mitigation - hauled and placed 100,000 CY of material. |
BLM CONSUMNES WETLANDS (+DU KRAUSE) | $ 103,367 | Created wetlands for the BLM at Consumes Wildlife Area - hauled and placed 25,000 CY of material. |
DU MENDOTA (+CWA 120 DUCK CLUB) | $ 88,610 | Created wetlands for Ducks Unlimited at Mendota Wildlife Area - hauled and placed 22,000 CY of material. |
NPS DRAKES BAY | $ 214,372 | Demolished out-buildings at Drakes Bay and hauled all waste to the dump. This project was an 8A project for the National Parks. |
BADGER CREEK | $ 299,961 | Built a large pond for BLM to create Giant Garter Snake habitat - hauled and placed 60,000 CY of material. |
WESTERVELT GRASSLANDS | $ 1,281,255 | Created upland and perineal wetlands for Giant Garter Snake habitat - hauled and placed over 250,000 CY of material making levees and ponds. |
DWR OAK VALLEY | $ 2,465,819 | Created stream restoration and habitat planting for DWR - hauled and placed 50,000 CY with rock steps pools in the new stream diversion channel. |
A&T RANCHES | $ 49,234 | General land leveling for local farmer. |
YUBA GOLDFIELDS | $ 635,973 | Hauled and placed 100,000 CY of material at the Yuba Gold Fields for 100-year flood protection along levees. |
2016 PROJECTS | AMOUNT | DESCRIPTION |
CWA WISTER UNIT 413 PHASE 2 | $ 437,425 | Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl. |
SCWA OFFICE GRADING | $ 21,915 | Hauled and placed 1.5" AB for an equipment pad. |
MBK JERSEY ISLAND RD830 | $ 388,730 | Hauled and placed 25,000 CY for levee toe berm in the Delta near Oakley, CA. |
HOSTETLER RANCHES ZAMORA GRADING | $ 288,253 | Worked T&M hauling 100,000 CY of soil for orchard development. |
WEST CENTRAL LANDFILL UNIT 4C | $ 3,887,498 | Hauled and placed 150,000 CY of soil to create a new cell for the West Central Landfill in Igo, CA. Also had subcontractor liner system installed and over 1,500 LF of 4" and 6" leachate system pipe installed by Four M. |
CWA PIXLEY UNIT | $ 278,080 | Hauled and placed 110,000 CY of soil to create habitat ponds and levees. |
GRANITE CARTER RESERVOIR SEDIMENT REMOVAL | $ 127,060 | Hauled and placed 33,000 CY of sediment for Granite after pond had be dewatered. |
NRCS LMC PROPERTIES WRP | $ 87,324 | Created wetlands for NRCS building water conveyance swales and habitat Islands - hauled and placed 18,000 CY of material. |
RCDSCC BRYANT HABERT ECOLOGICAL RESTORATION | $ 111,785 | Created wetlands and a levee road separating wetlands and farmer's field - hauled and placed 15,000 CY of material. |
RCDSCC BRYANT HABERT BIOREACTOR | $ 67,029 | Created bioreactor ponds for NRCS - hauled and placed 10,000 CY of material. |
FMFCD CONTRACT BDB-6 CLOVIS BASIN | $ 211,900 | Excavated and hauled 50,000 CY of soil from a detention basin to fill a large hole off site for a County of Fresno flood control district. |
WESTERN AGGREGATES CROSSING - T&M | $ 386,289 | Hauled and placed 112,000 CY of soil to create a levee for Western Aggregates - this Levee was used for their new conveyor belt line. |
TRLIA CROSSING 21 | $ 62,000 | Phase 2 finalization of a levee for Three Rivers at the Yuba Gold Fields - hauled and placed 10,000 CY of material. |
2017 PROJECTS | AMOUNT | DESCRIPTION |
CWA WISTER UNITS 312 & 513 | $ 167,593 | Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl. |
WESTERN AGGREGATES LEVEE - T&M | $ 233,002 | Hauled and placed 85,000 CY of soil to create a levee for Western Aggregates - this Levee was used to stay within permitted guidelines for the State. |
UCSB NORTH CAMPUS OPEN SPACE RESTORATION | $ 5,776,486 | Hauled and placed over 350,000 CY of material to restore and recreate wildlife habitat on an abandoned golf course near UCSB campus. Extensive dewatering, soil amendments, irrigation/planting, and SWPPP measures required for this project. |
DWR OAK VALLEY EXTENDED MAINTENANCE 2017 | $ 208,212 | Extended irrigation/planting maintenance contract for 2016 Oak Valley Mitigation project. |
BLM CONSUMNES RIVER PRESERVE | $ 151,564 | Worked for BLM at Consumes River Preserve - hauled and placed 33, 000 CY of material and cleaned up wetland fields. We also added a few levees to hold back water within the units. |
CWA KERN SWALE | $ 98,104 | Created 2 miles of water conveyance swale for Kern National Wildlife Area. After completion, Kern was able to distribute water more effectively. |
TULE RED 2017 WINTER MAINTENANCE | $ 195,240 | This project was to grade areas and clean some ditches so dewatering would be more effective prior to starting large excavation in 2018. |
NRCF ZAMORA WASTEWATER PONDS | $ 610,185 | Created (2) 1 acre ponds for Northern Recycling for wastewater collection and treatment. Once we hauled and placed 40,000 CY, we lime-treated the bottom of both ponds and our subcontractor installed liner system. |
GRANITE US GYP PLASTER CITY T&M | $ 64,597 | General land leveling for Granite working T&M. |
HOSTETLER RANCHES BAXTER MERCED T&M | $ 122,464 | General land leveling for local farmer. |
2018 PROJECTS | AMOUNT | DESCRIPTION |
GRANITE - USG PLASTER CITY | $ 82,789 | Worked for Granite Construction leveling with GPS on T&M. |
HOSTETLER RANCHES - BAXTER UNIT | $ 146,427 | General land leveling for local farmer. |
ACEC - DOS PALMAS TS-1 PIPELINE | $ 69,997 | Installed 1,500 LF of 4" HDPE drain pipe and a water control structure. |
CWA - KERN WILDLIFE UNIT SWALE | $ 297,700 | Four M has worked for CWA the past 12 years - hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl on all projects. |
SFCWA - TULE RED PH1 | $ 4,679,331 | Hauled and placed over 350,000 CY of soil to build habitat levee side slopes and for marsh plain grading. This was a Tidal Restoration Project - where extensive channel systems were excavated for the purpose of moving tidal water. Required strict adherence to the permits and sensitive mowing operations. |
NRCS - SMOKE CREEK | $ 1,381,304 | Hauled and placed over 80,000 CY of soil to create grouse habitat. Four M also built over 30 rock grade structures with over 10,000 tons of 24" minus rock. |
NRCS - RUSH CREEK | $ 439,764 | Hauled and placed over 10,000 CY of soil to create grouse habitat. Four M also built over 18 rock grade structures with over 7,000 tons of 24" minus rock. |
SCWA - PUTAH CREEK PH3 | $ 253,854 | Hauled and placed 20,000 CY of soil out of creek channel to create new channel diversion. Channel was done with (2) 36" pipes once grading was completed. |
BLM - HORSESHOE LAKE WETLAND | $ 350,000 | Created a large pond for BLM for Giant Garter Snake habitat - hauled and placed 80,000 CY of soil. |
CWA - KERN SUMP PUMP | $ 240,072 | This project was an 8A project, and our subcontractor installed a new pump station and catwalk for the refuge. |
WES - KINGS RIVER MITIGATION SITE | $ 361,834 | Hauled and placed over 50,000 CY of material to create wetland and upland areas at this site. |
CWA - PUTAH CREEK NAWCA | $ 148,325 | Hauled and placed 10,000 CY of soil out of creek channel to create new channel. Channel diversion was done once grading was completed. |