2012-2014 PROJECTS AMOUNT DESCRIPTION
USACE CONTRACT 2A MORRISON @ UPRR S. SAC. $ 9,342,122 Built 3,000 LF of 17' floodwall with earthen berm between property line and floodwall.
NAS LEMOORE SECURITY ENCLAVE $ 313,000 8a fencing and paving project for the department of the Navy.
MBK GILBERT PARCEL TULE NURSERY $ 65,835 Built small berm to create ponds for a tule nursery to supply habitat projects.
MBK RD 2025 HOLLAND TRACT LEVEE REHAB P2 $ 2,281,510 Built 2.5 miles of levee toe berm and added soil for levee side to make 3:1 slope - hauled and placed 150,000 CY of material.
SDCWA WISTER SPORT FISHERY $ 2,506,586 Worked for San Diego County Water Authority adding material to 4 large levees and removing two small levees to create one large pond - hauled and placed 250,000 CY of material.
CWA WISTER UNITS 114A & 413 $ 523,459 Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl.
GRANITE IID MANAGED MARSH $ 449,394 Created earthen habitat berms - hauled and placed 50,000 CY of material. Levees were 3' tall and 12' wide to hold back water for habitat restoration.
     
2015 PROJECTS AMOUNT DESCRIPTION
HOSTETLER FARMS $ 76,221 General land leveling for local farmer.
NRCS DRY CREEK $ 75,133 Created habitat building ponds and earthen berm for wildlife.
WESTERVELT COLUSA BASIN $ 372,491 Created habitat building ponds and earthen berm for Giant Garter Snake mitigation - hauled and placed 100,000 CY of material.
BLM CONSUMNES WETLANDS (+DU KRAUSE) $ 103,367 Created wetlands for the BLM at Consumes Wildlife Area - hauled and placed 25,000 CY of material.
DU MENDOTA (+CWA 120 DUCK CLUB) $ 88,610 Created wetlands for Ducks Unlimited at Mendota Wildlife Area - hauled and placed 22,000 CY of material.
NPS DRAKES BAY $ 214,372 Demolished out-buildings at Drakes Bay and hauled all waste to the dump. This project was an 8A project for the National Parks.
BADGER CREEK $ 299,961 Built a large pond for BLM to create Giant Garter Snake habitat - hauled and placed 60,000 CY of material.
WESTERVELT GRASSLANDS $ 1,281,255 Created upland and perineal wetlands for Giant Garter Snake habitat - hauled and placed over 250,000 CY of material making levees and ponds.
DWR OAK VALLEY $ 2,465,819 Created stream restoration and habitat planting for DWR - hauled and placed 50,000 CY with rock steps pools in the new stream diversion channel.
A&T RANCHES $ 49,234 General land leveling for local farmer.
YUBA GOLDFIELDS $ 635,973 Hauled and placed 100,000 CY of material at the Yuba Gold Fields for 100-year flood protection along levees.
     
2016 PROJECTS AMOUNT DESCRIPTION
CWA WISTER UNIT 413 PHASE 2 $ 437,425 Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl.
SCWA OFFICE GRADING $ 21,915 Hauled and placed 1.5" AB for an equipment pad.
MBK JERSEY ISLAND RD830 $ 388,730 Hauled and placed 25,000 CY for levee toe berm in the Delta near Oakley, CA.
HOSTETLER RANCHES ZAMORA GRADING $ 288,253 Worked T&M hauling 100,000 CY of soil for orchard development.
WEST CENTRAL LANDFILL UNIT 4C $ 3,887,498 Hauled and placed 150,000 CY of soil to create a new cell for the West Central Landfill in Igo, CA. Also had subcontractor liner system installed and over 1,500 LF of 4" and 6" leachate system pipe installed by Four M.
CWA PIXLEY UNIT $ 278,080 Hauled and placed 110,000 CY of soil to create habitat ponds and levees.
GRANITE CARTER RESERVOIR SEDIMENT REMOVAL $ 127,060 Hauled and placed 33,000 CY of sediment for Granite after pond had be dewatered.
NRCS LMC PROPERTIES WRP $ 87,324 Created wetlands for NRCS building water conveyance swales and habitat Islands - hauled and placed 18,000 CY of material.
RCDSCC BRYANT HABERT ECOLOGICAL RESTORATION $ 111,785 Created wetlands and a levee road separating wetlands and farmer's field - hauled and placed 15,000 CY of material.
RCDSCC BRYANT HABERT BIOREACTOR $ 67,029 Created bioreactor ponds for NRCS - hauled and placed 10,000 CY of material.
FMFCD CONTRACT BDB-6 CLOVIS BASIN $ 211,900 Excavated and hauled 50,000 CY of soil from a detention basin to fill a large hole off site for a County of Fresno flood control district.
WESTERN AGGREGATES CROSSING - T&M $ 386,289 Hauled and placed 112,000 CY of soil to create a levee for Western Aggregates - this Levee was used for their new conveyor belt line.
TRLIA CROSSING 21 $ 62,000 Phase 2 finalization of a levee for Three Rivers at the Yuba Gold Fields - hauled and placed 10,000 CY of material.
     
2017 PROJECTS AMOUNT DESCRIPTION
CWA WISTER UNITS 312 & 513 $ 167,593 Worked at Wister Wildlife Area for the past 12 years, hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl.
WESTERN AGGREGATES LEVEE - T&M $ 233,002 Hauled and placed 85,000 CY of soil to create a levee for Western Aggregates - this Levee was used to stay within permitted guidelines for the State.
UCSB NORTH CAMPUS OPEN SPACE RESTORATION $ 5,776,486 Hauled and placed over 350,000 CY of material to restore and recreate wildlife habitat on an abandoned golf course near UCSB campus. Extensive dewatering, soil amendments, irrigation/planting, and SWPPP measures required for this project.
DWR OAK VALLEY EXTENDED MAINTENANCE 2017 $ 208,212 Extended irrigation/planting maintenance contract for 2016 Oak Valley Mitigation project.
BLM CONSUMNES RIVER PRESERVE $ 151,564 Worked for BLM at Consumes River Preserve - hauled and placed 33, 000 CY of material and cleaned up wetland fields. We also added a few levees to hold back water within the units.
CWA KERN SWALE $ 98,104 Created 2 miles of water conveyance swale for Kern National Wildlife Area. After completion, Kern was able to distribute water more effectively.
TULE RED 2017 WINTER MAINTENANCE $ 195,240 This project was to grade areas and clean some ditches so dewatering would be more effective prior to starting large excavation in 2018.
NRCF ZAMORA WASTEWATER PONDS $ 610,185 Created (2) 1 acre ponds for Northern Recycling for wastewater collection and treatment. Once we hauled and placed 40,000 CY, we lime-treated the bottom of both ponds and our subcontractor installed liner system.
GRANITE US GYP PLASTER CITY T&M $ 64,597 General land leveling for Granite working T&M.
HOSTETLER RANCHES BAXTER MERCED T&M $ 122,464 General land leveling for local farmer.
     
2018 PROJECTS AMOUNT DESCRIPTION
GRANITE - USG PLASTER CITY $ 82,789 Worked for Granite Construction leveling with GPS on T&M.
HOSTETLER RANCHES - BAXTER UNIT $ 146,427 General land leveling for local farmer.
ACEC - DOS PALMAS TS-1 PIPELINE $ 69,997 Installed 1,500 LF of 4" HDPE drain pipe and a water control structure.
CWA - KERN WILDLIFE UNIT SWALE $ 297,700 Four M has worked for CWA the past 12 years - hauling and placing over 1.5 million yards of soil. The soil was used for levees, swales, and habitat Islands for waterfowl on all projects.
SFCWA - TULE RED PH1 $ 4,679,331 Hauled and placed over 350,000 CY of soil to build habitat levee side slopes and for marsh plain grading. This was a Tidal Restoration Project - where extensive channel systems were excavated for the purpose of moving tidal water. Required strict adherence to the permits and sensitive mowing operations.
NRCS - SMOKE CREEK $ 1,381,304 Hauled and placed over 80,000 CY of soil to create grouse habitat. Four M also built over 30 rock grade structures with over 10,000 tons of 24" minus rock.
NRCS - RUSH CREEK $ 439,764 Hauled and placed over 10,000 CY of soil to create grouse habitat. Four M also built over 18 rock grade structures with over 7,000 tons of 24" minus rock.
SCWA - PUTAH CREEK PH3 $ 253,854 Hauled and placed 20,000 CY of soil out of creek channel to create new channel diversion. Channel was done with (2) 36" pipes once grading was completed.
BLM - HORSESHOE LAKE WETLAND $ 350,000 Created a large pond for BLM for Giant Garter Snake habitat - hauled and placed 80,000 CY of soil.
CWA - KERN SUMP PUMP $ 240,072 This project was an 8A project, and our subcontractor installed a new pump station and catwalk for the refuge.
WES - KINGS RIVER MITIGATION SITE $ 361,834 Hauled and placed over 50,000 CY of material to create wetland and upland areas at this site.
CWA - PUTAH CREEK NAWCA $ 148,325 Hauled and placed 10,000 CY of soil out of creek channel to create new channel. Channel diversion was done once grading was completed.