Posts by adminjosh
Colusa Basin
2017 Project Open Space Restoration UCSB Santa Barbara
Monte Molina and Kevin Carr were the project managers and estimators for this project, located in Santa Barbara, CA. During this project FMC hauled and placed over 380,000 cubic yards of soil, placing this soil in different locations based upon certain soil types. Soil amendments such as gypsum and biochar were added, then disked and re-grade. Our major subcontractor KCI Environmental added an irrigation system to the site, along with all the erosion control, wattles, soil blankets, and seeding. Grading and rock structures were built along the creek. De-watering, and Asbestos pipe removal, was also completed on this project. This project was started in April of 2017 and completed in November 2017.
Putah Creek 2018
Project Database YEAR 2020
# | Project | CONTRACT AMOUNT |
---|---|---|
1 | WESTERN AGGREGATES – HAUL MATERIAL | $ 808,606 |
2 | CEMEX – CACHE CREEK DRY MINE | $ 106,483 |
3 | CWA – WISTER UNITS T10 & S22-20 | $ 413,685 |
4 | FORGEN – BEL MARIN KEYS | $ 268,504 |
5 | MARIANI NUT COMPANY | $ 987,318 |
6 | WESTLANDS WD – LOWER YOLO RESTORATION | $ 8,467,055 |
7 | NORTHERN RECYCLING LEVELING | $ 11,275 |
8 | MBK – YOLO BYPASS LEVEE REPAIR | $ 386,130 |
TOTALS | $ 11,449,056 |
2020 Lower Yolo Restoration Project
Yolo Restoration 2020
Scope: Habitat Restoration
Contract Value: $8.5 million
Work Completed: 2019-Present
Contact: Chuck Gardner (916) 708 8767
Four M Contracting, Inc worked for Westland’s Water District creating delta smelt, Swanson hawk, and giant Gardner snake habitat. FMC hauled and placed over 250,000 cubic yards. FMC created tidal channels for delta smelt, habitat for giant gardener snakes, and habitat for swain son hawks. 7 water control structures were installed with two being 48” tide gates. Pump station platforms were re-built using driven H-Bean, and welding a top plate for the pumps. Hauled and placed over 35,000 tons of AB for all roads onsite as well. Electrical improvements were done for (1) pump station including new meter, pole, and associated electrical equipment. The project also was seeded with native grasses and tulle clumps were installed per project plans. De-watering was completed using 4-8” pumps as needed onsite. This project was delayed due to Permits but still completed on time and with bid budget.
Project Database YEAR 2019
# | PROJECT | CONTRACT AMOUNT |
---|---|---|
1 | WESTERN AGGREGATES – HAUL MATERIAL | $ 626,314.00 |
2 | GRANITE – SOLAR FIELDS | $ 288,548.00 |
3 | GRANITE – MANAGED MARSH | $ 193,917.00 |
4 | CWA – WISTER UNITS T-10 & S-20 | $ 57,350.00 |
5 | NRCS – RUSH CREEK BDAs & REPAIRS | $ 125,382.00 |
6 | NRCS – SMOKE CREEK REPAIRS | $ 453,343.00 |
7 | CEMEX – CACHE CREEK STRIPPING | $ 1,249,943.00 |
8 | MORRO BAY ESTUARY – CHORRO CREEK | $ 832,758.00 |
9 | BLM – POND 3A | $ 57,500.00 |
10 | MALLARD DUCK CLUB | $ 411,502.00 |
11 | USACE – YOLO LEVEE REPAIRS | $ 738,143.00 |
12 | DUTRA – TULE RED PHASE 2 MOWING | $ 30,927.00 |
13 | NORTHERN RECYCLING GRADING | $ 36,576.00 |
TOTALS | $ 5,102,203 |
Tule Red 2018
Four M Contracting, Inc. hauled and placed over 350,000 cubic yards of saturated soils that had to be dried prior to placement, and compaction requirements. FMC had to manage all soil per the permit conditions of the project. Selective mowing, Water management, tides clearing, had to be managed throughout the project. 7,300' of new channel was constructed, along with 4 ponds, and many side channels. The breech of 500' remaining will occur sometime in 2019.
Project Database YEAR 2014
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
San Diego County Water Authority – Wister Fishery Project | SDCWA | $2,798,000 | $2,506,586 | Kevin Carr & Monte Molina | 10/2014 |
MBK Engineers – Holland Tract Levee Rehab Project; Reclamation District No. 2025 | Reclamation Dist 2025 | $2,184,600 | $2,281,510 | Kevin Carr & Monte Molina | 8/2014 |
Hostetler Ranches – Bellevue Ditch Grading | Hostetler Ranches | $4,750 | $4,750 | Monte Molina | 1/31/14 |
South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad – Contract 2A | U.S. Army Corp. of Engineers | $5,009,710.00 | $9,386,121 | Monte Molina & Kevin Carr | 2/2014 |
River Partners – Dutch Slough/Gilbert Parcel Tule Nursery | MBK Engineers | $65,835 | $65,835 | Monte Molina | 1/17/14 |
Project Database YEAR 2013
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Hostetler Ranches – Winters Orchard | Hostetler Ranches | $49,061 | $49,061 | Monte Molina | 12/31/13 |
MBK Engineers – Trailer Removal | MBK Engineers | $60,978 | $60,978 | Monte Molina | 12/13/13 |
CWA – Putah Creek | CWA | $180,498 | $180,498 | Monte Molina | 11/13/13 |
CWA – Viducich | CWA | $129,116 | $129,116 | Monte Molina | 10/4/13 |
CWA – Wister WA 514 | CWA | $139,225 | $139,225 | Monte Molina | 6/17/13 |
CWA – Hazard Unit East | CWA | $11,415 | $11,415 | Monte Molina | 5/22/13 |
CWA – Wister 515B | CWA | $35,500 | $35,500 | Monte Molina | 6/17/13 |
CWA – Wister Y16D Duck Stamp | CWA | $49,600 | $49,600 | Monte Molina | 6/17/13 |
CWA – WRP Phister Job 135 | CWA | $129,116 | $129,116 | Monte Molina | 8/9/13 |
CWA – WA 114 | CWA | $5,550 | $5,550 | Monte Molina | 7/11/13 |
KO Underground Construction North Bay WWTP | KO Underground Construction | $124,812 | Monte Molina | 6/17/13 | |
Ducks Unlimited Sunrise Marsh Prject | DU | $139,90 | $220,700 | Monte Molina | 9/9/13 |
CWA – WA312C | CWA | $95,075 | $115,805 | Monte Molina | 6/17/13 |
CWA – Hazard Unit | CWA | $48,282 | $48,282 | Monte Molina | 5/22/13 |
CWA – Wister W11B W11D | CWA | $202,436 | $202,436 | Monte Molina | 5/22/13 |
CWA Mecca Land Company Restoration Project | CWA | $18,472 | $18,472 | Monte Molina | 4/22/13 |
Hostetler Ranches – SloanRanch | Hostetler Ranches | $48,158 | $48,158 | Monte Molina | 4/15/13 |
Whitesbridge Farms, LLC Fresno Project | Whitesbridge Farms, LLC | $98,678 | $98,678 | Monte Molina | 4/15/13 |
Hostetler Ranches – Pond In Winters | Hostetler Ranches | $6,670 | $6,670 | Monte Molina | 3/2013 |
NAVFAC Southwest Lemoore Fead/Code ROPWL Naval Air Station Lemoore | NAVFAC Southwest | $313,000 | $313,000 | Kevin Carr | 3/2013 |
Hostetler Ranches – Merced Land Leveling | Hostetler Ranches | $192,215 | $192,215 | Monte Molina | 3/2013 |
Project Database YEAR 2012
Project Name | Project Owner | Original Contracted Amount | Final Contract Amount | Project Manager | Date Completed |
---|---|---|---|---|---|
Pit River RCD Ash Creek Wildlife Restoration Project | Pit River RCD | $870,730 | $870,730 | Monte Molina | 11/2012 |
Olam Tomato Processing Plant – Grading Work | Olam Tomato | $6,500 | $6,500 | Monte Molina | 6/18/12 |
Olam Tomato Processing Plant Leveling Project Hahn Road @ OHM road | Olam Tomato | $45,900 | $45,900 | Monte Molina | 6/11/12 |
Reclamation Dist. 2025, Holland Tract Levee Rehab Project, Spec#2025-09-11-1 | MBK Engineers | $509,710.00 | $731,201.98 | Monte Molina | 5/2012 |
Mariani Nut Almond Plant Leveling | Mariani Nut Company | T&M | $4009.00 | Monte Molina | 4/19/12 |
South Sacramento County Streams Group, Morrison Creek at Union Pacific Railroad – Contract 2A | U.S. Army Corp. of Engineers | 5,009,710.00 | Monte Molina & Kevin Carr | Still in progress |